مواقع التدريسيينجامعة الكوفة
0Publications
0Lectures
0Interests
0News

About

- PhD student in research stage at the Faculty of Engineering, University of Baghdad, Department of Civil Engineering, Project Management Engineering, 2024
- Master of engineering project management, South Tehran branch, 2022.
- Bachelor of Building and Construction Engineering from the University of Technology, Baghdad, 1995.
- Lecturer in the Engineering Survey Laboratory at the University of Kufa, Faculty of Urban Planning, Department of Environmental Planning, from 2015 to the present.
- Supervising civil engineer in the Department of Construction and Projects at the Presidency of the University of Kufa from 2009 to 2015.
Civil engineer in several contracting companies in Iraq, the UAE, and Jordan from 1997 to 2009.

Research Interests

7

Publications

2
2026

Identifying Causal Relationships and Response Strategies for Stakeholder Risks in Construction Projects

AuthorsYasser Sahib Nassar, Ahmed Reyadh Radhi, Ali Ezzat Hasan, Nabil Abdul Ridha Muslim
JournalJournal of Engineering Management and Systems Engineering
Date2026-09-29
Abstract

Owners, contractors, and consultants are among the stakeholders most vulnerable to high risk due to their intricate interactions over project phases. This study aims to identify and categorize the primary and secondary risk factors associated with these three parties and to examine the causal relationships among them to inform risk mitigation. A hybrid approach combining fuzzy theory and the Decision-Making Trial and Evaluation Laboratory (DEMATEL) method was adopted to analyze 32 secondary risk factors grouped under 3 primary risk factors. Nine experts, each with at least fifteen-year experience in risk management in engineering organizations, were consulted to identify and examine the risk factors. Based on the fuzzy DEMATEL (FD) model, risks were analyzed through a weighted impact matrix, and all risks were prioritized by identifying the causes leading to their effects. Owner risk (Degree of Dispatching (D) − Degree of Receiving (R) = +0.739) and contractor risk (D − R = +0.108) were classified as causes, whereas consultant risk (D −R =-0.84) was classified as an effect. The risk factors were coded RC1–RC32. From the consultant side, the second most prominent sub-factor (D + R = 2.635) was regulatory non compliance (RC15), which affected approval timelines and coordination with the consultant. As regards the owner, poor communication (RC5, D +R = 5.756) was a causal sub-factor. For the contractor, regulatory non-compliance (RC26, D +R=2.690) was the most prominent causal sub-factor. The analysis revealed divergent risk perceptions among stakeholders, thus highlighting the importance of a collaborative risk management framework.

2021

International project management standards and its impacts on increasing the quality of infrastructure projects(Case study of Najaf Ashraf province)

AuthorsNabil Abdul Ridha Muslim
Journal- UNIVERSITY-SOUTH TEHRAN BRANCHFACULTY OF TECHNICAL AND ENGINEERING
Abstract

This research was conducted with the aim of investigating the effect of project management areas on the success and quality improvement of construction projects (by choosing a project in Najaf Ashraf province), the members of the research community included engineers working in construction projects in Najaf province in Iraq. Their total number is about 175 people. Considering the characteristics of the statistical society and the small number and availability of all members, a simple random sampling method was chosen and 120 people were selected as a statistical sample using Morgan's sample size formula. Therefore, according to the random sampling method and consultation with a statistical consultant, 130 engineers working in the construction projects of Najaf province in Iraq were randomly selected and distributed questionnaires, which finally after many follow-ups And in total, 120 completed questionnaires were selected as the final sample. In this research, two PMBOK project management standards questionnaires were used. This questionnaire has 88 questions and 10 dimensions. And the standard questionnaire of Turner and Muller (2004) was used as factors related to construction industry projects. This questionnaire has 29 questions and 5 dimensions. The distribution status of the variables was investigated using the Kolomogrov and Smirnov tests, all of which were normal. The information obtained from the questionnaires was analyzed using the structural equation model test, and the results were as follows: based on the main hypothesis, it was determined that project management standards have a significant impact on achieving the goals of construction projects in Najaf Ashraf province by 63%. And in the sub-hypotheses, it was determined that the dimension of integrity management is 66%, the dimension of scope management is 58%, the dimension of time management is 53%, the dimension of cost management is 80%, the dimension of quality management is 71%, and the dimension of human resources management is 75%, communication management dimension by 70%, stakeholder management dimension by 68%, risk management dimension by 54% and procurement management dimension by 64% have a significant impact on achieving the goals of construction projects in Najaf Ashraf province. According to the establishment of structural equation conditions, all assumptions were accepted. Key words: project management standard, project success, achieving project goals, project quality, Najaf city

Lectures

4

المساحة الهندسية

المساحه العملي

المساحة الهندسية

المساحه العملي

المساحة الهندسية

المساحه العملي

المحاضرة الاولى

المساحة

News & Announcements

2
Announcements 2023-11-07

Weekly reports in the practical engineering surveying laboratory

Submitting weekly reports in the practical engineering surveying laboratory experiments and on the context followed in writing the practical report that was explained in the first lesson, along with attaching the field worksheet while conducting the experiment on site.

News 2023-11-07

Practical engineering surveying laboratory courses

The Surveying Laboratory offers the following training courses 1- A course on using the Level leveling device. 2- A course on using the Theodolite public surveying device. 3- A course on using the Total Station device. 4- A course on using the planometer. 5- Courses on leveling work and drawing longitudinal and cross sections. 6- Courses on calculating quantities of earthworks such as excavation and backfilling.

View details